02
Trenching.
Ducts.
Pipework.
Open trenching and the installation of utility ducts and pipework, planned around the site and the work to be completed.
Discuss the job
03
Built into
the ground.
DMC’s recent work includes narrow trenching with orange utility ducts and pipework installed along street-side routes. Each enquiry should be checked against the planned route, site conditions, pipe or duct specification, and any relevant project requirements.
For a useful first discussion
- Describe the service or pipework to be installed
- Share the route, site location, or available plans
- Note access, traffic, or pedestrian constraints
- Include photos if they help explain the site
Do not assume utility connections, testing, approvals, reinstatement, or emergency response are included; confirm these as part of the scope.


Have a job in mind?
Discuss your project